error_outline Item out of stock
local_fire_department Selling fast! Item low in stock

Integrating Kanban with MRPII - Raymond S. Louis

Oops!
Unfortunately it looks like someone took the last one.
No worries, we have many more interesting finds for you.
Browse similar

Why choose musicMagpie?
Title
Integrating Kanban with MRPII - automating a pull system for enhanced JIT inventory management
Author
Raymond S. Louis
format
Hardback
Publisher
Productivity Press
Language
English
UK Publication Date
19970830

Description

If you manage inventory, you probably use MRPII, a system based on a push method that embraces work and purchase order execution. MRPII helps you plan and integrate data relevant to your entire organization. But, when you have shifts in demand, you have to: 1) Realign and cancel hundreds of open manufacturing and purchase orders, and then 2) issue new orders.

Another system, kanban, is designed specifically to replenish inventory in just-in-time manufacturing. As consumption occurs, the kanban manual system triggers replenishment signals to the source of supply, so that both production and the supplier are constantly reacting to actual consumption. Compared to MRPII, kanban lowers inventory and minimizes shortages. But the manual process of recalculating every part number by hand, and triggering replenishment by faxing or calling suppliers, is time consuming and non-value-adding.

Automating kanban by blending the planning strength of MRPII with manual kanban pull methods enhances your flexibility and competitive position.

MRP's forward projection capability is used to:

  • recalculate kanban lot size.
  • perform a simulation to protect against non-linear demand.
  • inform production areas and suppliers of the anticipated demand levels for resource planning.
  • calculate staffing requirements for flexible work cells.

This system:

  • Automatically recalculates and triggers replenishment.
  • Integrates suppliers into the manufacturing loop.
  • Uses bar codes to enhance speed and accuracy of the receipt process.

Before moving in this direction, preparatory work is required. Work cells should be constructed with material located at the point of use. Container options and transportation methods need to be selected, kanban lot size calculations, and work cell staffing modules to develop. This book will help you deal with these and other topics. You will be able to take advantage of the author's expertise in the design, implementation and evaluation of these systems.

Chapters

  1. Eliminate Replenishment System Waste
  2. Replenishment System Basics
  3. Automated Kanban -- The Automated Flow Technology
  4. Kanban Prerequisites -- WCM Techniques
  5. Implementing Kanban
  6. Kanban and MRPII System Integration
  7. AFT Caculations for Determining Kanban Lot Sizes and Staffing Levels
  8. Perpetuation of the Automated Kanban
  9. Key Topics of the Automated Kanban System
  10. Three examples of AFT Implementation

Why buy with musicMagpie?

12 month warranty

FREE 12 Month Warranty on Tech

Magpie Certified Refurbished Tech

Magpie Certified Refurbished Tech

FREE Delivery on ALL Orders

FREE Delivery on ALL Orders

14 Day Money Back Guarantee

14 Day Money Back Guarantee

90 Point Refurbished Quality Check

90 Point Refurbished Quality Check

If you’re looking for something new to listen to, watch or play, look no further than the musicMagpie Store. We sell over half a million new and used CDs, DVDs, Blu-Rays, Games and Vinyl, spanning all kinds of genres and consoles, with prices starting from just £1.09! We also sell a wide range of refurbished Mobile Phones and Tech from major brands like Apple, Samsung, Sony, Microsoft and much more. With a 12 month quality warranty, you can save with total confidence.